Service Detail · Phased Decom

Phased decommissioning — multi-week, multi-cage, structured.

Whole-cage exits at 300+ servers, multi-tenant cage decoms, hyperscale-class retirements — these don't fit a single-pickup-day model. Phased execution: pickup window across multiple days, destruction batches running in parallel, floor-space release per cage as it empties.

No obligation · written CAD response within 2 working hours
Phased decom phases

What each phase looks like

  • Phase 1 (week 1) — kick-off, asset-list reconciliation, multi-cage logistics planning, operator-coordination call.
  • Phase 2 (week 1-2) — first cage pickup. Destruction batch starts running 24-48 hours after first cage arrival.
  • Phase 3 (week 2-3) — sequential cage pickups. Destruction batches running in parallel for cages already collected.
  • Phase 4 (week 3-4) — final cage pickup. Last destruction batch. Per-cage release receipts issued as cages empty.
  • Phase 5 (week 4) — consolidated disposition report, per-job Certificate of Destruction, CAD settlement.
Parallel destruction batches

How we structure destruction across long timelines.

For a 5-cage decom across 3 weeks of pickup, destruction batches run in parallel rather than sequentially. Cage 1's kit starts destruction while cage 2's pickup is happening. By the time cage 5 arrives, cages 1-3 may already have completed destruction.

Why parallel: total elapsed timeline shortens; per-cage release-receipt delivery accelerates; customer's settlement timeline doesn't wait for the last cage. Trade-off: more facility-side coordination on our end. Standard practice on multi-cage scopes.

FAQs · 1 question

Maxicom Canada — frequently asked

What's the minimum scope where phased decom makes sense?

Roughly 3+ cages or 200+ servers across multiple days. Below that, single-pickup-day model is more efficient. For 1-2 cages or under 200 servers, phased adds overhead without timeline benefit.

Last reviewed · Maxicom Canada Editorial & Compliance Team · Suggest a correction

Still reading?

Get an CAD-denominated quote within 2 working hours.

Send an asset list to purchase@maxicom.ca or call +1 437-996-2283. No obligation; per-line residuals; PIPEDA-aligned destruction included.

Get started — it takes 2 minutes

Get a written CAD quote within 2 hours.

No obligation. PIPEDA-aligned destruction documentation, NIST 800-88 + IEEE 2883-2022 standards, per-job Certificate of Destruction, settlement on uplift. Three ways to reach us.

1 Send asset list. CSV / spreadsheet with serials, makes, models.
2 Get CAD quote within 2 working hours, per-line residuals.
3 Locked uplift + NIST 800-88 destruction + CAD settlement.
📞 +1 437-996-2283 · Mon-Fri 09:00-18:00 ET · 📧 purchase@maxicom.ca