DC Decommissioning ยท 7-Day Release

Data-centre decommissioning, partial racks accepted.

From a single rack-pull to a full cage exit. Project-managed end-to-end: pre-pickup inventory, de-cabling, locked transit, NIST 800-88 destruction, asset disposition, photo-confirmed floor-space release. Settlement in CAD on uplift.

No obligation ยท written CAD response within 2 working hours
Decom phases

Phase-by-phase scope

  • โ™ฆ Pre-pickup: asset inventory, CMDB reconciliation, NDA, SoW, schedule.
  • โ™ฆ Cable management: de-cabling, bundle for return or recycling.
  • โ™ฆ De-rack: physical removal, palletisation, rack-frame strip or return.
  • โ™ฆ Locked transit: GPS-tracked, sealed, photographed at every transfer.
  • โ™ฆ Destruction: NIST 800-88 + IEEE 2883-2022 per device.
  • โ™ฆ Disposition: re-market, refurbish, or destruction-only โ€” documented per asset.
  • โ™ฆ Settlement: CAD applied within 5 business days of disposition.
  • โ™ฆ Floor-space release: photo-confirmed empty cage / tile-clear within agreed window.
Why partial-rack matters

We don't gate-keep on minimum size.

The volume players in Canada typically require whole-cage commitments before they'll quote. That's their right โ€” but it leaves the partial-rack and 5โ€“50 unit jobs underserved. We're explicitly built to serve that range.

  • Single-rack pull ยท 6โ€“24 servers from one cage โ€” quote same day, uplift within 7โ€“10 days.
  • Multi-rack pull ยท 100โ€“500 servers across multiple cages or floor-suites โ€” project-managed.
  • Full-cage exit ยท Whole-cage decommissions handled with multi-day pickup window if needed.
  • Tenant-side decom ยท Decom that affects only your equipment in a multi-tenant cage โ€” coordinated with the operator.
What a SoW looks like โ€” a sample excerpt

Real format, fake numbers.

โ€” Excerpt โ€”

Statement of Work โ€” Cage 12-A Decommissioning

Job reference: MXCA-2026-A-04217
Customer: [Customer name redacted] / Procurement reference: PO-XXXX
Scope: Decommissioning of 18 servers and 1 storage array from Cage 12-A at the customer's nominated SG colocation site (operator: Equinix SG3).
Pickup window: Saturday 11โ€“12 May 2026, 0700โ€“1900 SGT. After-hours pickup pre-coordinated with operator.
Pre-pickup: Asset list reconciled against customer CMDB on 8 May 2026. NDA executed both sides on 6 May 2026.
Destruction method: NIST 800-88 Purge (cryptographic erase) for SSDs and NVMe; NIST 800-88 Destroy (shred to <2mm) for HDDs and tape. IEEE 2883-2022 citations included.
Floor-space release: Photo-confirmed empty-cage receipt to operator within 24 hours of final pickup. U-position-by-U-position tally.
Evidence pack: Per-job Certificate of Destruction in PDF + PDF/A. PIPEDA Schedule 1, Principle 4.7 (Safeguards) alignment statement. OSFI B-13-aware citation. Operator and witness named.
Settlement: Buyback proceeds in CAD, applied within 5 business days of disposition completion. Estimated indicative gross: C$28,400.
Insurance: Transit cover C$2M per load, professional indemnity C$5M aggregate. Certificates attached as Annex A.
Decom timeline โ€” typical, fast, slow

What 7 days, 14 days and 28 days of decom actually look like.

Fast (7 days). Single-rack pull, partial-rack scope (6โ€“24 servers), no cross-border element, no on-site destruction. Day 1: asset list arrives, indicative CAD quote within 2 hours. Day 2: site survey + SoW. Day 3โ€“4: pickup window. Day 5โ€“6: in-facility destruction. Day 7: floor-space-release receipt + Certificate of Destruction. Day 8โ€“9: CAD settlement.

Standard (14 days). Multi-rack scope (50โ€“200 servers), single-site, in-facility destruction. Day 1: RFQ. Day 1: indicative quote. Day 2โ€“3: site survey. Day 4: SoW. Day 5โ€“9: phased pickup. Day 9โ€“11: destruction. Day 11: floor-space release. Day 13โ€“14: Certificate + settlement.

Large (28 days). Whole-cage exit (300+ servers), multi-day pickup window, multi-batch destruction queue, sometimes cross-border element. Day 1: RFQ. Day 2โ€“3: site survey + scope locking. Day 4โ€“5: SoW + NDA. Day 6โ€“10: kick-off + logistics planning. Day 10โ€“18: phased pickup over 3โ€“5 days within window. Day 18โ€“24: destruction batches; interim status updates. Day 24: floor-space release. Day 26โ€“28: Certificate + settlement.

Aggressive timelines are possible for genuine regulatory urgency โ€” we have compressed 14-day jobs to 5 days and 28-day jobs to 14 days when a specific deadline demanded it. The trade-off is typically operator-window inflexibility (after-hours pickups only, weekends mandatory) and small premium on the service fee.

What goes in a Canada data-centre decom SoW

Specific contractual sections we expect to negotiate

  • โ™ฆ Scope description: which racks, which cages, which assets, which destruction methods.
  • โ™ฆ Pickup window: agreed days and hours; security-clearance arrangements.
  • โ™ฆ Operator-coordination plan: cage access, vehicle parking, neighbour-tenant-impact mitigation.
  • โ™ฆ Floor-space-release deliverable: photo-confirmed empty cage; format and timing.
  • โ™ฆ Destruction method matrix: per-asset method per NIST 800-88 decision tree.
  • โ™ฆ Evidence-pack format: PIPEDA / TRM / ITSG-33 citations as applicable; PDF + PDF/A delivery.
  • โ™ฆ CAD pricing: per-line residual or whole-job buyback; destruction-only fees if applicable.
  • โ™ฆ Settlement terms: CAD on uplift, within 5 business days of disposition completion.
  • โ™ฆ Insurance + liability: transit cover, professional indemnity, public liability, agreed cap.
  • โ™ฆ Sub-contractor arrangements: where credentialed parties cover slices of scope.
  • โ™ฆ Cross-border arrangements: if scope includes North America sites, the partner-execution structure.
At a glance

Visual reference.

Decommissioning timeline TYPICAL 7-STEP FLOW ยท QUOTE TO SETTLEMENT 1 DAY 0 RFQ + asset list 2 DAY 1 Survey + SoW 3 DAY 3-5 Pickup scheduled 4 DAY 7-10 Locked uplift 5 DAY 7-12 NIST destruction 6 DAY 12 Certificate issued 7 DAY 14 CAD settlement
Typical decommissioning timeline โ€” 14 days quote-to-settlement
FAQs ยท 8 questions

Data centre decommissioning โ€” frequently asked

How fast can you release the floor-space?

Typical: 7 days from contract signature to photo-confirmed empty cage. Aggressive: 3โ€“5 days for urgent regulatory deadlines. Slower jobs (multi-cage, multi-tenant) coordinated to your timeline.

How long does a typical Canada data-centre decommissioning take?

Fast (single-rack, partial-rack scope, 6โ€“24 servers, no on-site destruction): 7 days end-to-end from asset list to settlement. Standard (multi-rack, 50โ€“200 servers, single-site, in-facility destruction): 14 days. Large (whole-cage exit, 300+ servers, multi-day pickup window, sometimes cross-border): 28 days. Aggressive timelines for genuine regulatory urgency are achievable โ€” we have compressed 14-day jobs to 5 days and 28-day jobs to 14 days.

Will you accept a partial-rack decommissioning?

Yes โ€” explicitly. Partial-rack pulls (6โ€“24 servers from one cage) are a positioning difference from the volume players in Canada who require whole-cage commitments. Same-day quote, SoW within a week, single-day uplift, total elapsed 7โ€“10 business days from asset list to settlement.

What does floor-space release look like as a deliverable?

Within 24 hours of the final pickup, we issue an empty-cage / tile-clear photo receipt with timestamped photos of every U position in the cabinet (or every tile in the cage), our pickup team's sign-off, and a cross-reference to the asset list that came out. The format is structured to match how Canada data-centre operators typically re-lease floor space โ€” most accept it directly into their re-lease workflow without follow-up.

Who handles data centre decommissioning in Canada?

Several vendor categories. Publicly-listed prime contractors (Procurri, SK TES) for whole-cage volume work, typically C$100K+ contracts and 6-week onboarding cycles. Maxicom Global Canada for partial-rack and mid-market 5-500 unit scope โ€” 1-week onboarding, same-day quotes, partial-cage acceptance, per-job Certificate of Destruction with FSM-N21-aware citation for bank-IT decom. Local recyclers for pure recycling without buyback. The right vendor depends on scope size, urgency, and evidence-pack requirements.

How long does data centre decommissioning take in Canada?

Fast (single-rack, 6-24 servers, in-facility destruction): 7 days end-to-end from asset list to settlement. Standard (multi-rack, 50-200 servers, single-site): 14 days. Large (whole-cage, 300+ servers, multi-day pickup): 28 days. Aggressive timelines (5-day compress, 14-day compress) achievable for genuine regulatory urgency. Phase 1: indicative quote within 2 hours. Phase 2: site survey + SoW within 24-48 hours. Phase 3: pickup window. Phase 4: destruction. Phase 5: floor-space release + Certificate + settlement.

What's included in a Canada DC decommissioning service?

Pre-pickup: asset inventory, CMDB reconciliation, NDA, SoW, schedule. Cable management: de-cabling, bundle for return or recycling. De-rack: physical removal, palletisation, rack-frame strip or return. Locked transit: GPS-tracked, sealed, photographed at every transfer. Destruction: NIST 800-88 + IEEE 2883-2022 per device with two-operator + witness sign-off. Disposition: re-market, refurbish, or destruction-only documented per asset. Settlement: CAD on uplift within 5 business days. Floor-space release: photo-confirmed empty cage / tile-clear within 24 hours of final pickup.

Will Maxicom decommission Equinix data centre racks?

Yes โ€” tenant-side decommissioning at Equinix SG1 through SG5 is standard scope. Operator-coordination call during onboarding covers cage access, vehicle parking, security clearance, and adjacency-tenant impact. Equinix has established processes for tenant-side decom; we run our work to fit those processes. After-hours and weekend pickup windows supported. Floor-space release receipt structured to match Equinix's typical re-lease workflow โ€” directly accepted into their re-lease process without follow-up paperwork.

Last reviewed ยท Maxicom Canada Editorial & Compliance Team ยท Suggest a correction

Still reading?

Get an CAD-denominated quote within 2 working hours.

Send an asset list to purchase@maxicom.ca or call +1 437-996-2283. No obligation; per-line residuals; PIPEDA-aligned destruction included.

Get started โ€” it takes 2 minutes

Get a written CAD quote within 2 hours.

No obligation. PIPEDA-aligned destruction documentation, NIST 800-88 + IEEE 2883-2022 standards, per-job Certificate of Destruction, settlement on uplift. Three ways to reach us.

1 Send asset list. CSV / spreadsheet with serials, makes, models.
2 Get CAD quote within 2 working hours, per-line residuals.
3 Locked uplift + NIST 800-88 destruction + CAD settlement.